MCB
Trips on overload and short circuit.
- Protects cables
- One per circuit
- Prevents overheating
Coordinate load calculation, circuit separation, protective devices, surge protection, enclosure, labelling and earthing for safer, maintainable power distribution.
The board splits power into labelled circuits, and each device trips before a fault can hurt someone or damage equipment.
A safe board needs all three working together.
Trips on overload and short circuit.
Trips on earth leakage in milliseconds.
Diverts lightning and switching surges.
Planning backup power too? See UPS & battery backup.
A device rating cannot be selected in isolation. Cable capacity, fault level, load type, earthing arrangement, discrimination and local requirements all matter.
Circuit separation, residual-current protection and clear distribution-board schedules.
Floor, department and essential-load panels designed for maintainability and expansion.
Layered surge and power-quality considerations for networking, CCTV, automation and electronics.
Exact specifications depend on the selected product, capacity and system architecture.
Product selection works best when connectivity, infrastructure, security and deployment responsibilities are considered together.
Review integrated network, security, communication and deployment capabilities.
Protection only works with correct wiring and a tested earth.
Share the site, workflow, capacity and support requirements before quotation.
Clear answers to common planning and selection questions.
An MCB trips on overload or short circuit, an RCCB trips on earth leakage to protect people, and an SPD diverts voltage surges away from equipment.
Usually an earth-leakage fault in a circuit or appliance, or moisture. A load and insulation check finds the cause before it is reset.
Yes. Zerolink surveys the existing wiring and load, then plans a safer, labelled board with the right protection devices.
Arrange a survey with existing panel photographs, connected-load details and known power problems.
Request RecommendationZerolink begins with site or workflow discovery, confirms the appropriate architecture and documents the agreed implementation scope before commissioning.