4–8 channels
Homes, shops and small offices.
- 1–2 hard disks
- Built-in PoE on many models
- Compact
Select the recorder around camera count, incoming bandwidth, decoding, analytics, retention period, storage bays and remote-access requirements.
The CP PLUS 4K NVR is the brain of the camera system: it records every camera, finds events fast and streams to your phone.
Count today’s cameras, then add about 25% for future ones.
Homes, shops and small offices.
Offices, schools and hotels.
Factories, campuses and warehouses.
Pick disks with Seagate SkyHawk or WD Purple, and size them with the storage calculator.
A reliable NVR design balances camera streams, recording quality, playback, analytics and future expansion.
Compact channel counts with simple remote viewing and appropriately sized retention.
Multi-camera recording, user access, playback and operational monitoring.
Higher channel counts, multiple drive bays, analytics and structured network design.
Exact specifications depend on the selected product, capacity and system architecture.
Product selection works best when connectivity, infrastructure, security and deployment responsibilities are considered together.
Review integrated network, security, communication and deployment capabilities.
Pair the recorder with AI cameras that cut false alerts.
Share the site, workflow, capacity and support requirements before quotation.
Clear answers to common planning and selection questions.
It depends on the model’s channel count and incoming bandwidth. Zerolink matches the NVR to your camera count, resolution and future expansion.
Retention depends on cameras, resolution, compression and hard-disk size. Use the storage calculator in our CCTV guide, then we confirm the disk size.
Yes. The NVR is set up for secure remote viewing on the mobile app, with passwords changed from the defaults.
Share the camera count, resolution, frame rate and required recording duration.
Request RecommendationZerolink begins with site or workflow discovery, confirms the appropriate architecture and documents the agreed implementation scope before commissioning.